Wall mounted kitchen tap installation planning: spout position, concealed body depth, pipe centres, solid fixing, no hidden joints, testing before tiling.
A wall-mounted kitchen tap depends on work done before the wall is finished: fix the spout height and reach, set the pipe centres and depth from the maker's drawing, support the fitting solidly, test, and only then close the wall.
Choose the tap before the pipes
Exposed wall mixers connect to two stubs projecting from the finished wall, often with adjustable unions. Concealed models place a body inside the wall with a plate and spout outside. Their pipe positions are not interchangeable. Obtain the drawing and, ideally, the fitting itself before first fix.
Set the position
| Dimension | Decide from |
|---|---|
| Height above worktop | Bowl depth, tall pans, window sill |
| Horizontal position | Centre of the bowl or between two bowls |
| Spout reach | Water lands inside the bowl, away from the back |
| Handle swing | Clear of tiles, shelves and upstand |
| Finished wall line | Board, adhesive and tile thickness |
Bristan's wall-mounted fitting sheet asks installers to settle the final position, add battens in the cavity where needed to support the body, and respect stated working pressures. A second Bristan sheet shows that a concealed model may specify a cavity depth, so check before assuming a thin partition will take it.
Wall type
A timber or metal stud wall needs noggins fixed where the body and plate screws will fall. Solid masonry needs a chase deep enough for the body and lagged pipes without weakening the wall. External walls bring frost and condensation risk, and a kitchen worktop upstand may collide with the pipe position.
Pipework rules
The rules on concealed fittings are important here: fittings designed to be operated or maintained, and joints, should not be concealed, and pipes should not be embedded in a wall in a way that prevents removal. Ask the installer how the supply pipes will be ducted or sleeved and where any serviceable parts remain accessible. Add isolating valves in a reachable cupboard, since the tap itself offers none once the wall is closed.
Pressure and flow
Compare the tap's minimum pressure with your system. Where one supply is stored and the other comes from the main, the Bristan sheet requires approved check valves on unbalanced supplies. Another model may differ.
First fix checklist
- Mark finished surfaces and bowl centre on the wall.
- Fix supports and bracket level.
- Run pipes with the left inlet hot unless the drawing says otherwise.
- Fit protective caps and templates.
- Flush through to remove swarf.
- Pressure test and inspect.
- Photograph with a tape before closing.
Second fix
Cut tile holes to the plate's cover, leaving the maker's clearance for removal. Seal around plates as instructed, so splashes cannot run into the cavity. Fit the spout without straining the thread, open valves slowly, and run through the aerator after flushing. Check inside the sink cupboard and the room behind the wall if there is one.
Maintenance access
Keep the model name, cartridge part number and a first fix photograph. A concealed cartridge should be reachable from the front; confirm that with the drawing.
For help with positions or pipe routes, describe the wall and tap on the contact form and send the drawing by email quoting your reference. Tiling and plastering are separate trades unless agreed.
Common mistakes
Setting the pipes from the unfinished wall leaves trims standing proud or buried once tiles are on. Guessing the bowl position before the sink arrives puts the stream off centre. A third error is closing the wall without a pressure test, so that the first sign of a weeping joint is damp plaster. Check each of these against the first fix photograph before the board goes on.
Questions people ask
Can a wall tap replace a deck tap without opening the wall?
Only if suitable pipework already reaches the right position or surface pipes are acceptable. Otherwise the wall must be opened.
When is the tap body fitted?
Many designs need parts fixed and pipes tested at first fix, with trims added after tiling.