Preview build. Not indexed.

Pipework and repiping

A copper pipe with a grey push-fit elbow in a floor void

Replacing old or awkward water pipes, rerouting for building work and tidying redundant runs: planning, access, information needed and testing before cover.

Repiping replaces lengths of water or heating pipe that are corroded, undersized, badly routed or in the way. It can be one branch to a new basin or most of the supply in a property under renovation.

Reasons to look at it

Recurring leaks on the same run, old steel or lead, flow that collapses when two outlets open, dead ends left from earlier alterations and building work that cuts across existing routes are the usual prompts. None of them proves that everything needs replacing. Ask for the case for each section.

Lead can be recognised as a dull grey, soft metal that shows a shiny surface when gently scraped, often with swollen joints. Do not cut or sand it. Your water company can tell you about testing and its own part of the supply.

What the job involves

  1. Tracing what each pipe carries and where it can be isolated.
  2. Planning routes, sizes, materials and access points.
  3. Opening floors or walls where agreed.
  4. Installing, clipping and insulating the new runs.
  5. Removing redundant lengths so water does not sit stagnant.
  6. Filling, flushing and testing before anything is closed.

Replacing metal pipe with plastic can interrupt electrical bonding. An electrician should check earthing and bonding where metal sections are removed.

What we need from you

A floor plan or sketch, photos of exposed pipes and the incoming supply, the property age if known, floor construction, any renovation programme and whether the home will be occupied. For flats and terraces, mention shared supply pipes.

Safe first steps

Before any opening up, test the stop valve. Mark visible leaks and pipes you suspect carry gas so nobody confuses them; gas pipework is handled only by a Gas Safe registered engineer. Do not notch or drill joists yourself to make a route, since structural timber has limits on where it can be cut. In older properties, have suspect materials tested for asbestos before they are disturbed.

How it is checked

New runs are put under pressure and every joint is inspected while still visible. Outlets are run one by one to confirm hot and cold identity, flow and drainage of test water. Clips, spacing, insulation and labelled valves are looked over. Ask for photographs of concealed routes before boards go back; they help whoever drills there later.

Joints and materials

Alterations can depend on joining imperial pipe to metric, soldered joints, compression fittings, releasing push-fit connectors, bending copper and cutting in tight spaces.

Notice and approval

Certain alterations require advance notice to the water company, including some underground pipework. Establish who is giving that notice. Then send the outline of the project through the contact form.

Making good

Settle who lifts and replaces floor coverings, who boxes in new runs and who repairs plaster. These tasks sit apart from the pipework and are easy to leave unassigned.

Record who agreed each point.

How it works

From enquiry to agreement

Send my job list
  1. 01

    Describe it

    What is wrong or what you want changed, where it is and when it started.

  2. 02

    Add your details

    Postcode, how to reach you and the days that suit.

  3. 03

    Email photos

    A close view, a wider view and any model label, with your reference.

  4. 04

    Agree it in writing

    The scope, who supplies parts and how the price is worked out.

Water escaping now

Do these three things first

Safety comes before the enquiry. Send the form afterwards for the repair and any making good.

  1. 01

    Turn it off

    Close the internal stop valve if it is safe to reach. It is often under the kitchen sink or where the supply enters.

  2. 02

    Stay clear of electrics

    Do not touch wet sockets, fittings or appliances. Switch off at the consumer unit only if the way to it is dry.

  3. 03

    Get someone to attend

    Phone someone who can come now. A web form is not the place for water that is still running.

One list, however many jobs

Add what needs fitting or replacing, tell us the postcode, then email photos.

Send my job list