Bathroom first fix checklist

Published

First fix plumbing bathroom checklist: pipe positions from drawings, waste falls, valves, supports, pressure test, photographs and sign off before tiling.

Bathroom first fix is complete when every pipe, waste, support and concealed fitting matches the product drawings, holds pressure, drains properly and is recorded. Close nothing until those checks are done.

Before any pipe

  • Final model of bath, toilet, basin, shower and radiator chosen, with drawings.
  • Finished floor and wall levels agreed.
  • Layout marked on site.
  • Soil pipe and drain route confirmed.
  • Hot water system and pressure known.
  • Approvals and leaseholder consent where required.

Wastes

  • Sizes and traps follow Approved Document H: for example a 32 mm basin trap and 40 mm bath and shower traps.
  • Falls and lengths within the branch limits.
  • WC branch at least 100 mm for a standard outlet.
  • Single unventilated WC branch no longer than 6 m (Diagram 3; Table 2 prints 15 m, so use the stricter figure).
  • Access for clearing.
  • Open ends capped.

Water supplies

  • Positions from each drawing, hot left and cold right unless stated.
  • Servicing valves where reachable.
  • Backflow protection planned for hoses and bidets.
  • No joints buried inaccessibly; see concealed fittings rules.
  • Pipes clipped, insulated where needed, cold kept cool.

Supports

  • Noggins for basin, rails, screens, radiators.
  • Toilet frame fixed and level.
  • Bath floor checked for load.
  • Joists notched only within limits.

Electrics and air

  • Fan duct route and supplies planned with the electrician.
  • Shaver unit, light and towel rail positions agreed with the electrician to suit the bathroom electrical zones.
  • Underfloor heating coordinated.

Testing

  • System flushed.
  • Pressure test performed and recorded. Schedule 2 requires water systems to withstand one and a half times design pressure, with test methods for plastic and non-plastic pipe.
  • Wastes water tested.
  • Joints inspected with dry paper.

Record

Photograph each wall and floor with a tape visible and a label showing which wall it is. Note distances from fixed corners to every pipe. Keep product codes for concealed valves and cisterns.

How the pressure test is defined

Schedule 2 sets out separate test procedures for systems with and without plastic pipe, because plastic expands under load and pressure readings behave differently. Ask the installer which method applies, what test pressure was used and how long it was held, and keep that note with the photographs.

Notification

Some items, such as large baths, bidets with hoses and certain pumps, are notifiable to the water company before work. Check early.

Sign off

Walk the room with whoever is tiling. Confirm tile thickness has not changed, mark access panels and agree which holes are cut at second fix. A change of product after this point should trigger a re-check of positions.

What second fix covers

Sanitaryware, taps, trims, seals and final testing follow. Keep the water off or capped until fittings are connected.

Using the checklist

Print it, tick it with the installer and write comments beside anything unresolved. Before the walls close is also the cheapest moment to add a valve, a noggin or a spare duct.

If you want help with the plumbing items, send the layout through the contact form and email drawings with your reference.

Common gaps found late

A missing noggin for the screen, a toilet supply on the wrong side, a basin waste set for a different unit and no access to a concealed valve are typical findings once tiles are on. Reading each product drawing against the open wall, one fitting at a time, catches most of them. Check that delivered goods carry the same model codes as the drawings, because a substituted item may need different centres.

Weather and downtime

Agree how the home will have water and a usable toilet while the room is open, and cap supplies at the end of each working day. In cold weather protect exposed pipes in unheated voids, and drain any section that will stand idle with the heating off.

Questions people ask

What is first fix?

The hidden pipework, wastes and supports installed before walls and floors are finished.

What should I check before tiling?

That pipes are tested, positions match drawings, supports exist and every route is photographed.