Preview build. Not indexed.

Replacing a bath with a shower

Published

A level shower tray on adjustable legs with its trap and waste pipe underneath

Bath to shower conversion planning: tray size, waste fall, water supply, walls and sealing, electrical limits and the order the trades should work in.

Converting a bath to a shower replaces the bath with a tray or wet floor, moves the water outlet to a shower valve and head, reworks the waste, and waterproofs the walls. The waste fall and the water supply decide what is practical, so check them before choosing anything.

Start with the footprint

A standard bath space of about 1700 x 700 mm can take a long rectangular tray, a shorter tray with a shelf or storage at one end, or a square tray plus a basin move. Check tray sizes against the real wall measurements and remember the screen and door swing.

Drainage

Bath wastes sit above floor level under the tub. A low shower tray sits much lower, so the pipe has less height to work with.

Approved Document H gives a 40 mm trap with a 50 mm seal for a shower, reducible to no less than 38 mm only where it discharges directly to a gully. It also limits unventilated branches, though its diagram shows a bath and no separate shower run. The possible solutions are:

Floor condition Option
Timber floor, joists running towards the stack Pipe within the floor void
Joists across the route Raised tray, or a route agreed without weakening joists
Solid floor Tray on a plinth, or a channel cut by a suitable contractor
No gravity route Pump unit, with its own maintenance, noise and power needs

Never notch or drill joists without knowing the permitted positions.

Water supply

Find out how hot water is produced and whether hot and cold arrive at similar pressure. That determines which valve will work. A thermostatic mixer helps limit sudden temperature changes. A pump added to a low-pressure system must suit it, and a pump or booster over 12 litres a minute connected to a supply pipe, along with certain shower units, appears on the list of work to notify to the water company. Pumps must never be added to a system the maker excludes.

Cap bath pipes properly at the branch where practical so no dead length is left, and keep joints accessible: the water fittings rules restrict concealed and embedded fittings.

Walls and waterproofing

A bath only splashes part of the wall. A shower soaks it. Expect to remove old tiles and plaster, fit suitable boards, apply a waterproofing system with taped corners and tile or panel to the maker's method. Plan the valve box or fixing plate and a way to reach isolation valves before the wall closes.

Electrical

An electric shower needs a dedicated circuit sized for it. In England, new circuits, and additions or alterations to circuits in the defined special location around a bath or shower, are notifiable work. Use an electrician who can certify it. Check where existing lights, fans and switches will fall relative to the new shower area.

Order of work

  1. Survey: measurements, joists, stack position, supply type.
  2. Choose tray, screen and valve together.
  3. Strip out the bath, noting that older panels and boards may need an asbestos check first.
  4. First-fix pipes, waste and cable.
  5. Floor preparation and tray bedding.
  6. Boards, waterproofing, tiling.
  7. Second-fix valve, screen and sealing.
  8. Test for leaks and drainage before regular use.

Questions for any quote

Who removes the bath and waste? Who tiles, plasters and handles electrics? What happens if rot appears? Is the pump or new drainage included? Ask for the scope in writing.

The plumbing element for the base is described under shower tray fitting. Enter the room measurements in the contact form and email photos of both bath ends with your reference.

Questions people ask

Do I need building regulations approval?

Plumbing swaps often do not, but electrical changes near the shower, structural alterations and new drainage can bring requirements. Check with local building control.

Should a home keep one bath?

That is a household and resale judgement, not a plumbing rule. Think about who bathes there now and who may in future.

One list, however many jobs

Add what needs fitting or replacing, tell us the postcode, then email photos.

Send my job list