Preview build. Not indexed.

Macerator discharge pipe runs: lift, fall and bends

Published

Macerator pipe run rules for installation: when one is allowed, vertical lift before horizontal, fall, bend losses, pipe size, stack joint and power needs.

A macerator discharge pipe is a small bore pumped line with strict limits. Rise first, then run horizontally with a continuous fall, use smooth bends, count their losses and connect properly to the soil stack. The model's own performance chart overrides general advice.

Check that it is allowed

Approved Document G says a WC with macerator and pump may connect to a small bore drainage system discharging to a stack only if there is also access to a WC discharging directly to gravity drainage, and the unit meets BS EN 12050-1 or 12050-3. Building control approval may apply to the new room. Consider leaseholder consent and noise.

What a maker requires

The Saniflo SAN02 instructions give a clear example:

Rule Detail in that sheet
Pan Horizontal outlet spigot to EN 33 or EN 37
Order of run Vertical lift before the horizontal run, at the start
Fall Horizontal pipe at least 1:100, or 10 mm per metre, to the stack
Pipe Copper or rigid solvent weld plastic; sizes stated by the sheet
Bends Smooth bends or two 45 degree bends, not 90 degree elbows
Bend loss About 50 cm of vertical performance for each elbow
Stack Joined with a suitable strap-on boss
Clips Fixings no more than a metre apart

Other models have other limits. Do not transfer figures between units.

Reading the performance chart

Height and length trade against each other: the more the unit lifts, the shorter the horizontal run it can serve. Find your lift on the chart, read the permitted length, then subtract the allowance for each bend. Leave margin; a run designed at the extreme will perform poorly once pipes collect deposits.

Siphoning

Where the discharge falls to a level considerably below the unit, water can be pulled out of the macerator. The same sheet recommends an air admittance valve of a stated rating at the high point to prevent this. Place it where the maker says and keep it accessible.

Practical planning

  1. Mark the unit position behind the pan with service access.
  2. Identify the stack and the entry height.
  3. Draw the route with vertical section, bends and length.
  4. Check fall can be achieved through joists or boxing.
  5. Add a drain-off point so the pipe can be emptied for service, as the sheet advises.
  6. Lag any external pipe against freezing.
  7. Provide an access panel.

Checking an existing run

Before replacing a unit, trace the old discharge pipe. Sagging sections, extra elbows or a lift added partway along may not suit the new model, so compare the whole route with its chart instead of reconnecting by habit.

Electricity

The sheet requires installation by a qualified person, connection to a fused unswitched fixed outlet with a 5 amp fuse, and not an ordinary plug. Bathroom rules add further conditions on position.

Commissioning and use

Run water before waste, watch every joint under pumping and listen for repeated activation, which may indicate water dripping from the cistern. Only toilet waste, paper and permitted water belong in it; wipes and sanitary items damage the mechanism. Keep the instructions where users can find them.

What this guide does not cover

Faults, blockages and leaking units need diagnosis by someone competent on that equipment. For a new installation enquiry, describe the room, stack position and distances on the contact form and email a sketch quoting your reference.

Before choosing the unit

List every appliance that will discharge into it, because inlets, temperature limits and pumping capacity differ between models. Check that the unit can be lifted out through the finished room, that its isolating arrangements are reachable and that spare parts and servicing are available. Tell everyone who will use it what must not be flushed. During a power cut it will not pump, so the toilet should not be flushed until power returns.

Questions people ask

Can a macerator toilet be my only toilet?

Approved Document G allows the small bore connection only where there is also access to a toilet draining directly by gravity.

Can the pipe go up after running along?

The maker's sheet used here requires any lift at the start, before the horizontal section.

One list, however many jobs

Add what needs fitting or replacing, tell us the postcode, then email photos.

Send my job list