Moving a toilet depends on the drain: how far it can go, the fall a 100mm branch needs, floor depth, ventilation, macerator limits and approvals to check.
A toilet can be moved when a waste pipe of the right size can run from the new position to the stack or drain with enough fall, without cutting the structure apart. Short moves along the same wall are often realistic. Moves across a room live or die on floor depth.
The numbers that govern it
Approved Document H gives these figures for unventilated branches from a WC with an outlet over 80 mm:
| Item | Guidance |
|---|---|
| Pipe size | 100 mm |
| Minimum fall, single connection | 18 mm per metre |
| Maximum length, single WC to a stack (Diagram 3) | 6 m |
| Maximum length printed in Table 2 (up to eight WCs) | 15 m |
The two lengths do not agree for a single toilet, so work to the stricter 6 m. Beyond that, or where the layout falls outside the guidance, ventilate the branch or agree the design with building control. Bends, other connections and the point of entry into the stack also have conditions.
Work out the fall
Multiply the run in metres by 18. A 2 m run drops at least 36 mm; 4 m drops at least 72 mm. Add the pipe's outside diameter, about 110 mm for common plastic soil pipe, plus space for sockets and supports. That total is roughly the depth the route occupies, before any floor finish.
Where can the pipe go?
- Between joists, parallel to them: often the easiest.
- Across joists: a 100 mm pipe cannot simply be notched through timber. This needs a structural design or another route.
- Above the floor behind a duct: works if the pan outlet is high enough, as with a wall-hung pan on a frame.
- Solid floor: the slab must be broken out and reinstated, with damp protection considered.
- Outside the wall: an external branch may be possible with correct supports and access.
- Raised platform: gains fall at the cost of a step.
Ground floor details
A ground floor WC may connect straight to a drain only within the depth limit in Approved Document H, 1.3 m from floor to drain. Access for rodding must remain.
The macerator question
A pump unit lets waste travel through small pipe and even upwards, but Approved Document G requires access to another toilet on gravity drainage, and the unit depends on electricity. Consider noise and maintenance too.
Check the other fittings
A new route can affect appliances that share it. A basin or shower branch joining close to a toilet connection may need to enter at a different point to avoid water seals being pulled or waste crossing into the other pipe. Draw every fitting that drains into the same stack, including any in a neighbouring flat that you know about, and include the plan in what you give building control.
Water and old pipework
Extending the cold supply is usually the simple part. Cap the old branch and remove redundant soil pipe back to the junction with a proper sealed fitting so no open or stagnant stub remains.
Permissions
Altering drainage is normally building work. In a flat, the stack is often the freeholder's, and cutting into it without consent can breach the lease. Cast iron or older fibre cement stacks need particular care and identification before cutting.
Information to gather
- Plan with old and new positions, dimensioned.
- Joist direction and floor depth.
- Photo and material of the stack.
- Whether a ceiling below can be opened.
- Property tenure.
A realistic next step
Ask for an opinion on the route before buying fittings or ripping up flooring. Describe the move in the contact form and email the plan and photos; drainage alterations, joinery and making good may each need a different person. See also connecting to the soil pipe.