Preview build. Not indexed.

Adding a downstairs toilet

Downstairs toilet installation planned properly: find a drainage route, bring hot and cold water, provide extraction and a basin, and check approvals first.

A downstairs toilet needs four things settled before any fitting is chosen: a way for waste to reach the foul drain, a water supply, ventilation, and a place for hand washing. If you can describe where each will come from, the rest is ordinary fitting work.

Drainage

Find the nearest soil stack, branch or inspection cover. Gravity drainage needs a continuous fall. Approved Document H shows a 100 mm branch for a toilet with an outlet over 80 mm, a minimum fall of 18 mm per metre for a single connection and two unventilated lengths (15 m in a table, 6 m for one WC in a diagram; keep to 6 m), with extra rules where a ground floor toilet connects directly to a drain.

Breaking into a drain or stack, and any excavation, may be work for a drainage contractor. A shared drain can belong to the water company, so confirm before cutting.

Where no gravity route exists, a macerator and pump may be possible. Approved Document G conditions this on there also being access to a toilet that discharges directly to a gravity system, among other requirements. So it is not an answer for a home's only toilet.

Water

  • Cold supply to the cistern with a servicing valve beside it.
  • Hot and cold, or a suitable water heater, for the basin.
  • A route that avoids burying joints in walls or solid floors.

Ventilation

Approved Document F lists an intermittent extract rate of 6 litres per second for sanitary accommodation, with opening-window purge ventilation as an alternative. Plan the duct route to outside. The fan's wiring belongs to an electrician.

Room and approvals

Check the space needed and the building regulations points. Speak to building control before work, and to your freeholder if you hold a lease.

What the plumbing visit covers

Agree this in writing for your own job:

Item Decide who supplies or does it
Pan, cistern, basin, tap You or the plumber
Supply pipes and valves Plumber
Waste branch inside the room Plumber
Drain connection outside Possibly drainage contractor
Fan, lighting, sockets Electrician
Stud walls, door, plaster, floor Builder or joiner

What to send

  1. A floor sketch with wall lengths, door and ceiling height.
  2. Photos of the proposed space, including under any stairs.
  3. Photos outside the nearest wall showing pipes, gullies and covers.
  4. Floor construction: timber or solid.
  5. Property type, and whether you rent or lease.
  6. Any fittings already bought.

Send the notes through the contact form and email the photos with your reference. Ask for the price and exactly what it includes before agreeing, and ask who coordinates the other trades. No price is published here because drainage distance and building work vary too much between homes.

How it works

From enquiry to agreement

Send my job list
  1. 01

    Describe it

    What is wrong or what you want changed, where it is and when it started.

  2. 02

    Add your details

    Postcode, how to reach you and the days that suit.

  3. 03

    Email photos

    A close view, a wider view and any model label, with your reference.

  4. 04

    Agree it in writing

    The scope, who supplies parts and how the price is worked out.

Water escaping now

Do these three things first

Safety comes before the enquiry. Send the form afterwards for the repair and any making good.

  1. 01

    Turn it off

    Close the internal stop valve if it is safe to reach. It is often under the kitchen sink or where the supply enters.

  2. 02

    Stay clear of electrics

    Do not touch wet sockets, fittings or appliances. Switch off at the consumer unit only if the way to it is dry.

  3. 03

    Get someone to attend

    Phone someone who can come now. A web form is not the place for water that is still running.

One list, however many jobs

Add what needs fitting or replacing, tell us the postcode, then email photos.

Send my job list